Posted by on May 23, 2018

These costs were developed by VDOT, Germanna, and VAA.

  • Asphalt Field I – $350
  • Asphalt Field II – $350
  • Asphalt Plant I – $350
  • Asphalt Plant II – $350
  • Slurry Surfacing – $275
  • Surface Treatment – $275
  • Mix Design – $650
  • Full Depth Reclamation (FDR) – $300
  • Cold Asphalt Recycling: Plant – $300
  • Cold Asphalt Recycling: Field – $300