These costs were developed by VDOT, Germanna, and VAA.
- Asphalt Field I – $350
- Asphalt Field II – $350
- Asphalt Plant I – $350
- Asphalt Plant II – $350
- Slurry Surfacing – $275
- Surface Treatment – $275
- Mix Design – $650
- Full Depth Reclamation (FDR) – $300
- Cold Asphalt Recycling: Plant – $300
- Cold Asphalt Recycling: Field – $300